General Notice

Notice No. 603: Students of 3rd Semester 2019 are hereby requested to report to the office on 21.10.19 and 22.10.19 (from 12:30 p.m. to 01:30 p.m) in connection with uploading of papers for WBSU Semester 3 Examination 2019.

Posted on October 17, 2019

Notice No. 602: All the students are hereby notified that the WBSU Inter College Athletic Meet, 2019 will be held on 8th & 9th November 2019 at K. N. Roy Kendriya Krirangan, P.G.G.I.P.E., Banipur, Habra, North 24 Parganas. For detailed information read this notice carefully.

Posted on September 30, 2019

Notice No. 600: The college will remain closed for Puja Vacation from 30.09.2019 to 12.11.2019. However for enabling the students to get the classes under CBCS system (Semester Based) The classes will be held during the vacation on the following dates from 11:00 a.m. to 03:00 p.m. 30/09/2019, 01/10/2019, 16/10/2019 to 18/10/2019, 21/10/2019, 22/10/2019, 24/10/2019, 25/10/2019, 04/11/2019, 05/11/2019, 08/11/2019, 11/11/2019 All the teachers are hereby detained for taking classes and other administrative work during the entire vacation period. The college office will also remain open on the days mentioned above. All the non-teaching staff are also detained for the entire vacation period.

Posted on September 30, 2019

Notice No. 595: Regarding the Third Lecture of the ‘Ethics and Value Education Lecture Series’ on “Animal Welfare and Climate Change”. For detailed information read this notice carefully.

Posted on September 19, 2019

Notice No. 592: This is for the information of all concerned that on the occasion of Viswakarma Puja , which falls on 18th September this year , the college will be closed on 18th September, 2019 instead of 17th September, 2019.

Posted on September 16, 2019

Notice No. 591: Regarding District Level Youth Parliament Quiz Competition. For detailed information read this notice carefully.

Posted on September 14, 2019

Notice No. 590: Students are requested to submit the application forms along with original and photocopy of required documents for the following scholarships. For detailed information read this notice carefully.

Posted on September 14, 2019

Notice No. 589: Distribution of Mark Sheets of B.A/B.Sc University Examination. For detailed information read this notice carefully.

Posted on September 12, 2019

Notice No. 588: To be read in continuation of notice no: 547 dated 23.07.2019, notice no: 566 dated 16.08.2019 and notice no: 575 dated 27.08.2019 (Regarding Registration SEM-I 2019). For detailed information read this notice carefully.

Posted on September 12, 2019

Notice No. 587: The college will remain closed on 10/09/2019 for the occasion of Muharram.

Posted on September 9, 2019

Page 1 of 2412345...1020...Last »

Let's make something great together

View GalleryGet in Touch

Infrastructure

Building

The College has a large four storied building which is under construction.

Library

The College has a library with an open access system for books.

Laboratory

The college has 3 laboratories which are well equipped for the students.

CCTV

The college will install CCTV facility for students’ own protection.