Posted on November 17, 2020
Posted on November 12, 2020
Posted on November 8, 2020
Posted on November 4, 2020
Posted on October 31, 2020
Posted on October 29, 2020
Posted on October 29, 2020
Posted on September 25, 2020
Posted on September 16, 2020
Posted on August 10, 2020
The College has a large four storied building which is under construction.
The College has a library with an open access system for books.
The college has 3 laboratories which are well equipped for the students.
The college will install CCTV facility for students’ own protection.