Posted on March 12, 2022
Posted on March 10, 2022
Posted on March 7, 2022
Posted on March 2, 2022
Posted on March 1, 2022
Posted on February 9, 2022
Posted on January 24, 2022
Posted on January 17, 2022
Posted on January 17, 2022
Posted on January 2, 2022
The College has a large four storied building which is under construction.
The College has a library with an open access system for books.
The college has 3 laboratories which are well equipped for the students.
The college will install CCTV facility for students’ own protection.